Level crossing fault at Melton causes delays for rail passengers between Ipswich and Lowestoft

Services between Ipswich and Lowestoft via Saxmundham and Beccles could be delayed by up to 20 minut

Services between Ipswich and Lowestoft via Saxmundham and Beccles could be delayed by up to 20 minutes. - Credit: Lucy taylor

Rail passengers travelling between Ipswich and Lowestoft faced delays on Saturday night due to a level crossing fault near Woodbridge.

Services between Ipswich and Lowestoft via Saxmundham and Beccles were delayed by around 20 minutes because of the level crossing failure in Melton.

The fault was first reported at around 6pm and Network Rail engineers and repaired it by 11pm. Police were called to the scene to control traffic.


You may also want to watch:


Become a Supporter

This newspaper has been a central part of community life for many years. Our industry faces testing times, which is why we're asking for your support. Every contribution will help us continue to produce local journalism that makes a measurable difference to our community.

Become a Supporter
Comments powered by Disqus